• SAVE MOUNT LEINSTER FROM INDUSTRIAL DEVELOPMENT
    Coillte proposes to build 7 colossal wind turbines on the slopes of Mt Leinster, adjacent to a Special Area of Conservation. With a proposed height of 178m, significantly higher than any existing turbine in the region, this scale is normally placed offshore. There has been inadequate public consultation about this wind farm proposal and the majority of the local community are unaware of it. As local representatives, we urge you to safeguard this visually sensitive and ecologically valuable area and to protect our natural heritage for future generations. We appeal to you to collaborate in order to save Mt Leinster and the Blackstairs by taking the following measures: 1. Suspend the current windfarm planning application process until circumstances allow for appropriate public consultation. Coillte’s planning strategy has deprived the local and wider community of their right to engage in meaningful participation. 2. Introduce an immediate moratorium on new wind farm developments pending updating of the outdated 2006 national wind energy guidelines. 3. Strengthen County Carlow’s Wind Energy Strategy (WES) by making Mt Leinster and The Blackstairs a “No Go” area for windfarm development and industrialisation of any sort. 4. Strengthen legislation to protect our biodiversity and our Special Areas of Conservation (SACs). 5. Protect and preserve our wild places. • This proposed windfarm would destroy the Mt Leinster region and have a hugely negative impact on local tourism. Mt Leinster attracts locals and visitors from all over the country to its mountain wilderness. They engage in all sorts of activities from strolling along the beautiful country lanes in the unspoilt rural foothills of south County Carlow, to hillwalking, mountain biking, paragliding, kite flying, eco trailing, foraging and birdwatching. - The proposed turbines would be directly in front of the Nine Stones, a designated protected viewing point. The wonderful panoramic vista that currently greets visitors would be replaced by the sight, sound and flicker shadow of these massive industrial turbines, which would totally dominate the landscape. - The turbines would be seen from many scenic trails in Ireland’s Ancient East including The South Leinster Way, The Mount Leinster Heritage Drive, The Sky Road and newly launched Turas Columbanus part of the Europe-wide Columban Way. • With the exception of a small group of local landowners who were briefed in Oct 2019, there has been no public consultation by Coillte. Notwithstanding Covid 19 restrictions, there was no dissemination of information by any means for over a year. - An online information site about the proposed windfarm only went live at the end of Nov 2020 - see www.croaghaunwindfarm.ie approximately 9 days before the planning process began. - The distribution of an information brochure, only circulated in the first week of Dec 2020, was limited to houses within 2km of the proposed windfarm. • Of additional concern is the proposed access route for transport of building materials from Bunclody to Mt Leinster. This route runs through an area of outstanding natural beauty comprising narrow country roads, lined with ancient hedgerows and granite stone walls. They represent a rapidly vanishing aspect of our built and natural heritage. Once destroyed they can never be replaced. Coillte state that they will “temporarily upgrade” this road in order to facilitate transport of oversize loads, which would include 110M columns and 65M rotor blades. • The windfarm would also have a detrimental ecological impact. The Blackstairs contains a vast SAC, a designation which protects endangered habitats and biodiversity. The proposed windfarm site is just 400M from this SAC boundary. Only 13% of Ireland has SAC status. In this time of biodiversity crisis it is profoundly ecologically unsound to build an industrial wind farm so close to an SAC. - The proposed construction site is partly comprised of blanket bog. The recent catastrophic bogslide in Donegal demonstrates the devastating environmental destruction wreaked by inappropriate windfarm planning on bogland. • The new climate emergency bill has identified offshore wind energy as the most efficient solution to Ireland’s climate crisis. Our government has committed to the rapid development of this technology early next year. - It makes no sense to put gigantic and environmentally destructive wind turbines on land in one of the most scenic parts of Ireland when a much more efficient and environmentally sensitive technology will be available offshore in the near future. • Carlow’s WES describes the Mt Leinster/ Blackstairs region as unsuitable for windfarm development because of its value for tourism, the high quality of its scenery and the sensitivity of its landscape. - This same strategy states that Mt Leinster and 14 other areas across the Blackstairs are still “open for consideration” for windfarm development. - This anomaly needs to be addressed - if planning permission is granted for this windfarm it will set a precedent and create the potential for the proliferation of windfarms throughout The Blackstairs. • Currently there are very few wind turbines on the Carlow Blackstairs, but the NW corner of the Wexford Blackstairs is saturated with them. - Wexford’s WES has responded to this by making the Wexford Blackstairs a “ No Go area" for windfarms. - Can Carlow County Council collaborate with Wexford County Council and treat The Blackstairs mountain range as a single entity and protect it accordingly? • Mt Leinster and the Blackstairs have escaped the industrialisation that has blighted so many other parts of rural Ireland. Wild unspoilt places are few and far between. Once lost they are gone forever.
    3,645 of 4,000 Signatures
    Created by The Blackstairs and Barrow Valley Network . Picture
  • Fix Ireland's Climate Bill 2020! #FixTheBill
    In 2020, Climate Case Ireland took the Government to the Supreme Court for failing to act on climate change - and won. However, the fight for climate justice isn’t over. Ireland’s Climate Bill 2020 threatens to undermine the impact of the Supreme Court’s landmark judgment in Climate Case Ireland and creates a legal framework so weak as to be incapable of enabling the urgent action needed. The Climate Bill must be revised to protect the historic Supreme Court judgment and ensure that Ireland finally adopts legislation which has climate justice, a just transition, and a clear commitment to remaining below +1.5°C as its central organizing principles. Sign your name to let the Government know they must fix Ireland’s Climate Bill! #FixThe Bill 1. Learn from Climate Case Ireland: Climate Case Ireland successfully challenged the Government’s 2017 National Mitigation Plan on the basis that the Government had failed to specify how it would achieve the objective of the original 2015 Climate Act within section 4(2)(a). The re-drafted 2020 Climate Bill makes changes to reduce accountability such as: a. Removing and replacing section 4(2)(a) of the Act. To preserve the effect of the Supreme Court's judgment, section 4(7), as inserted by the Bill, should be deleted or amended to be "without prejudice" to section 4(6); b. Requiring the government only to “pursue” the 2050 goal rather than “pursue and achieve”; the latter was the phrase used in the 2015 Act and in the previous Government’s 2019 Heads of Bill; c. Use of weak, permissive language to reduce legal accountability, such as “have regard to” and “in the opinion of the Government/Minister”; d. The Bill no longer refers to achieving an “environmentally sustainable economy”. This should be reinstated. 2. A 2030 Target: The National Climate Objective should reflect an explicit commitment to complete decarbonisation (not “net-zero”)* by 2030 at the very latest and an equitable and scientifically sound commitment to remaining below +1.5C (*zero energy emissions combined with nature-based solutions that enhance biodiversity to sequester carbon from sectors where some emissions remain inevitable). The Bill should include a ratchet mechanism empowering the Minister to bring forward the decarbonisation year and interim targets, which are needed in the Bill. 3. Climate Justice and Just Transition: Decarbonising Ireland’s economy in a decade will not be easy. The principles of climate justice and just transition should be defined and should include the principle of a progressive distribution of the financial burden of climate mitigation and adaptation measures. These must be the central organizing principles of the Bill, with clear accountability mechanisms. 4. Reliance on undeveloped and untested technologies: The Bill should aim for complete decarbonisation by 2030, rather than a ‘climate neutral economy’ – the Bill currently implies large-scale use of unproven CO2 “removal” technologies. 5. Interim targets: The Bill’s carbon budgets should be pegged to interim targets that will put Ireland on a pathway to a decarbonisation target year of 2030. 6. 7% not enough: The Programme for Government commitment to reduce emissions by 7% a year on average over the next decade is not enough to make a fair share contribution to keeping global temperature rise below +1.5°C. 7. Strengthen language: The requirement to ‘have regard to’ should be strengthened to ‘consistent with’ in relation to: a. The objective of the UNFCCC and the temperature limits specified in the Paris Agreement b. Fulfilling the principles of climate justice and just transition; c. Fulfilling the objectives of the National Biodiversity Action Plan and the Aarhus Convention. 8. Legal accountability needs to be built in throughout the Bill: Carbon budgets should be legally binding, and all activities undertaken by public bodies, Government departments and private industry should be consistent with the carbon budgets. Failure to remain within the carbon budget limit should be met with clear sanctions. 9. Obligations on public bodies: all public bodies should be required to carry out their duties in a manner ‘consistent with’ the temperature limits and principles of the Paris Agreement. 10. Reparations: Financing emissions reductions efforts overseas alongside the provision of technological support should be viewed as reparations for harms done due to climate change under the Loss and Damage mechanism. 11. Include emissions from international aviation and shipping. 12. Impact assessment and reporting: All plans, projects and programmes should be assessed for their full climate impacts including non-territorial emissions. The EPA should be tasked with monitoring and reporting on “consumption emissions” in addition to territorial emissions. 13. Fossil fuel infrastructure and fracked gas: The construction of new fossil fuel infrastructure and the re-permitting of existing infrastructure should be prohibited by the Bill, including for example liquefied natural gas (LNG) terminals and gas-fired power plants and storage facilities. We also call for the insertion into the Bill of a section amending the Petroleum and Other Minerals Development Act 1960 to prohibit the importation or sale of fracked gas. 14. Actively disseminate information on the functions of public bodies under the Bill & guarantee public participation. 15. Provisions relating to the Climate Change Advisory Council should be amended to: a. Replace voting ex-officio members with independent experts in industrial relations, law and social justice b. Ensure the Council is adequately resourced, gender balanced, and inclusive of directly affected interests (eg youth and migrants from worst impacted nations), c. Be tasked with regular reporting on whether current policies and plans represent “progression” and Ireland’s “highest possible ambition” (Paris Agreement).
    2,168 of 3,000 Signatures
    Created by Climate Case Ireland Picture
  • Stop Unsustainable Fishing in Irish Inshore Waters
    In 2018 the Irish government implemented a ban on trawlers greater than 18m to fish within 6 nautical miles of the Irish coast. The High Court has since overturned this ban with the current law now allowing boats of any size to fish anywhere with no regulations or quotas enforced. Not only is this detrimental to inshore ecosystems, smaller Irish fishing communities cannot compete with large unregulated trawlers coming inshore. Bantry Bay in West Cork is one particular area that is currently at the detriment of unsustainable fishing practices. Although Bantry Bay is a designated Special Area of Conservation (SAC), drone footage of pair trawling was captured here in October 2020. This area is home to marine invertebrates, fishes, elasmobranchs, seabirds and marine mammals. While pair trawlers are fishing legally, with no regulations or quotas, they are fishing at an unsustainable rate and removing a critical food source (sprat and herring) for many larger marine species. Additionally, 80% of Irish fishing vessels are less than 12m and cannot compete with large trawlers. We need the Irish government to support small Irish fishing communities and protect our marine environment and its inhabitants. The Minister of Agriculture, Food and Marine , Charlie McConalogue has recently lodged an appeal against the High Court’s decision to allow large trawlers to fish within 6 nautical miles of the Irish coast. We call on the High Court to reinstate this ban on trawlers greater than 18m to fish within 6 nautical miles of the Irish coast.
    201 of 300 Signatures
    Created by ORCA Ireland Ocean Research & Conservation Association Picture
  • Preserve and Restore Lovers Lane Ródán, Carndonagh
    At a time where 'connection' has become so important as we have all reflected on the effects of this pandemic on our families and communities, we must stand to oppose the wilful damage to our local folk-history heritage sites and preserve these for the future. The restoration, preservation and reopening of the 'Ródán' known as 'Lovers Lane' should not be a political matter...it is a necessary action to protect the living history and shared heritage for our community. 'Lovers Lane' is recorded as a public right of way on OS maps dating to the 1800's and is likely to be much older than this. There is a strong local folklore history connected to this site which is currently in the process of being ripped out by bulldozers by a local construction firm in the name of development. The planning documents show no permissions to interfere, damage or indeed close this public right of way...no public notification has been made to announce the closure of this public pathway which is heavily used by walkers, who now, due to the illegal closure and damage to the pathway, have to walk across a newly opened construction site entrance (which there is no planning permission for) along a busy narrow road and onto a major artery road, putting the public in harms way. We, the undersigned community of Carndonagh insist on the cessation of damage, the restoration to it's original state for preservation and the immediate reopening of the Ródán 'Lovers Lane' in Carndonagh, Co. Donegal.
    671 of 800 Signatures
    Created by Sinead Smyth
  • Better lighting in Phoenix Park
    For years Phoenix Park has been providing a place for exercise and fresh air but has never been fully utilised during the winter months due to poor lighting.In these winter months, people have a right to use and feel safe in their parks. This is especially important during Covid restrictions when indoor facilities are closed.  Many of us have other responsbilities such as work, caring, school etc during day light hours. The lack of lighting in the park means people feel unsafe going to get the exercise needed for our mental and physical health. We want the OPW to enable the public make use of the park, even during dark evenings. Additional lighting could be installed for limited periods along the main road, helping people stroll, walk or run safely throughout the winter months.
    682 of 800 Signatures
    Created by Cllr. Darcy Lonergan
  • One Stamp for All Spouse and Dependents Immigrants #Equal Rights Ireland
    Immigrants spouses are being treated and marked as herds by giving them stamp 3/1g, making it impossible for them to access the job market. What are the spouses being punished for?? It is causing mental and health deterioration for the skilled immigrants who are suffering financially by being dependent on spouses. Isolation during covid-19 is building up some serious mental concerns as depression and suicidal thoughts. Furthermore adding to the misery of immigrants, stamp 1g is given to the graduates on job search and spouses of CSEP holders and hosting agreement holders. Recruiters are not willing to entertain anyone on Stamp 1g or stamp 3. Now with many of them listing an eligibility criteria as EU/Stamp 4 holder only may apply. Immigrants' spouses who have stamp 1g or stamp 3 are as if they are handcuffed for a crime which is simply being a dependent to a permit holder or critical skill worker. Dependent immigrants want to work and equally contribute to the society and pay taxes.
    58 of 100 Signatures
    Created by Aysha Mazhar
  • Paperless Offices
    45% of office printouts end up in the trash every day! The Environmental Paper Network reports that over the past 50 years, there’s been a four-fold increase in global consumption of paper. Despite the fact, that we live in the era of digitizationand have all the tools we need to make paperless offices a real thing, our love affair with paper has continued and there is no sign that this madness will end soon. But it should end now, because that's what the people want: 89% of Gen Zers said they are concerned about the planet’s health, and of this, 94% were of the view that businesses should help address urgent issues. And they are right! Climate change isn't only caused by diesel engines and coal-fired power plants. It's a challenge we all have to face together, both the industry and the people. In 2020, the year COVID-19 forced us to install digital workplaces across the globe, which are here to stay! In fact, BCG’s recent Workplace of the Future employer survey found that companies expect about 40% of their employees to follow a remote-working model in the future. That being said, it is an ideal time to rethink how many unnecessary copies of documents, customer orders, approval forms, and emails are printed each day.. (Source 1: https://www.myhubintranet.com/paper-saving-tips-12-ways/) (Source 2: https://environmentalpaper.org/) (Source 3: https://www.bcg.com/publications/2020/remote-work-works-so-where-do-we-go-from-here)
    6 of 100 Signatures
    Created by Erika Taylor
  • Protect the Inshore Fisheries
    At present the 18mt Pelagic Trawlers can work inside Bays and with the HP and Sonar available to them, the fish has no where to go or hide. there is no quotas and no regulations in place, we dont have any study to see if this is Sustainable in any way, so we need to stop until we wipe out the stocks beyond repair.
    23 of 100 Signatures
    Created by Brian OROURKE
  • The Hamilton Way
    Dunsink Observatory in Dublin 15 was built in 1785 and is a unique part of the scientific and cultural heritage of Ireland. It has been home to many of Ireland’s greatest scientists, including Sir William Rowan Hamilton, and has played an important part in astronomical discovery and public engagement in Ireland for over two centuries. The observatory currently receives about 5,000 visitors per year, but access to the observatory is limited via Dunsink Lane. We therefore propose a ~450 metre foot and cycle route to the observatory from the top of Dunsinea Lane (at Phoenix FC/Priorstown House gates). The Hamilton Way would transform access to the observatory and open it up to many more visitors from Ashtown, the Royal Canal, Tolka Valley Park and the Phoenix Park. Learn more about the Hamilton Way at https://www.dunsink.dias.ie/hamiltonway/.
    1,377 of 2,000 Signatures
    Created by DIAS Dunsink Observatory Picture
  • Support the Motion to Ban Drilling
    Dervilla, environmental campaigner says: "In the midst of a climate emergency there is evidence that the oil and gas industry is attempting once more to come in and put at risk the health and future of the public and the border regions. In 2014, then Energy Minister Arlene Foster issued an order which meant the licence to explore for shale gas in Fermanagh was terminated. We need her and her party to show that she will stand with us." Support the motion https://bit.ly/3nIw0ZC
    612 of 800 Signatures
    Created by Nicola Browne
  • SOS Stop the Seal Shooting
    At a time when biodiversity is being lost at an alarming rate, instead of this ludicrous scheme and bowing to lobbyists for profit, there should be increased protection for all wildlife and promotion of veganism. Fish stocks have been depleted due to overfishing and not giving time for regeneration, which are the actions of humans, not seals.
    124 of 200 Signatures
    Created by Marese Hickey
  • Stop Development on Gallwey's Hill Tramore
    The former owner of this site should be commemorated as someone who triumphed over adversity, by dedicating this iconic viewing spot in Tramore to those who struggle due to exclusion. An accessible community garden with coffee shop would offer all in the town and beyond, a space and workplace for inclusion along with environmental appreciation.
    910 of 1,000 Signatures
    Created by Una Dunphy